Wood Drying Topics > Drying Defects
Agressive Schedules?
(1/1)
TILLAMOOK:
How do I know when my schedule is too aggressive?
HencoV:
Short Answer...
*excessive downgrade and/or
*dry outer shell, wet core
*longer drying times to try and get rid of wet core
....
please feel free to add
PhilM:
I agree with the previous answer. In addition, a large moisture content variability between pieces is an indication you are drying too fast.
DrykilnsMan:
Make sure your not running out of control, i.e. vents fully open & current wet bulb set points not being achieved. Same goes for dry bulb set points.
Navigation
[0] Message Index
Go to full version